Additional Works near Rufaisah Dam Area

Project Overview

CLIENT:

Sharjah Government

CONSULTANT:

Jacobs

MAIN CONTRACTOR:

Darwish Engineering Emirates

CONTRACTOR:

Al Dail Al Handasi Roads Main Cont LLC

VALUE OF PROJECT:

5 Million AED

SCOPE OF WORK:

Earth Works

The Additional Works Near Rufaisah Dam Area project involved carrying out road improvement and supporting infrastructure works in one of Sharjah’s key development areas. The project included earthworks, grading, road formation, site preparation, and associated civil works designed to improve accessibility and long-term road performance.

Using experienced engineers, skilled operators, and a modern fleet of heavy equipment, our team completed the project safely, efficiently, and according to the required specifications while maintaining the highest standards of quality.

Key features

Construction and upgrading of road sections to improve accessibility and traffic flow.

Earthworks & Grading

Bulk excavation, grading, and land preparation completed with modern construction equipment.

Site Development

Preparation of construction areas and supporting infrastructure for future development.

Quality & Safety

Strict quality control procedures and Health & Safety standards maintained throughout the project.

PROJECT EXECUTION PROCESS

Every stage of the project was carefully planned to ensure efficient execution, timely delivery, and compliance with engineering specifications.

Site Investigation & Planning

Project assessment, engineering review, surveying, and work planning.

01

Construction & Earthworks

Excavation, grading, road construction, and supporting civil works completed using advanced heavy equipment.

02

Inspection & Project Completion

Final inspections, quality assurance, finishing works, and successful project handover.

03

PROJECT CHALLENGES & SOLUTIONS

Working near an important public infrastructure area required careful coordination, proper planning, and strict safety procedures throughout construction.

Project Challenges

Restricted Working Area:

Construction activities required careful planning due to limited working space.

Environmental Protection:

Extra precautions were taken to protect the surrounding environment during construction.

Project Coordination:

Close coordination between project teams ensured smooth execution without delays.

Project Solutions:

Reliable Utility Infrastructure:

Poor space planning slows production & creates bottlenecks.

Flexible Unit & Plot Configurations:

Poor space planning slows production & creates bottlenecks.

Optimized Operational Design:

Poor space planning slows production & creates bottlenecks.