SCOPE OF WORK:

Earth Works

The Rufaisah Dam to Tunnel project was a major earthworks and infrastructure development project carried out to support the construction of an important transportation corridor in Khorfakkan. The project involved large-scale excavation, rock cutting, grading, site preparation, embankment construction, and earthmoving operations across challenging terrain.

With the support of experienced engineers, skilled operators, and a modern fleet of heavy construction equipment, 77 Contractor successfully completed the project while maintaining high standards of quality, safety, and operational efficiency.

Key features

Mass excavation, filling, grading, and earthmoving operations carried out to prepare the project corridor.

Rock Excavation

Specialized excavation and rock cutting works completed to achieve the required road alignment and formation levels.

Infrastructure Preparation

Preparation of stable foundations for future road construction, drainage systems, and supporting infrastructure.

Health, Safety & Quality

Comprehensive quality inspections and strict Health, Safety & Environmental (HSE) procedures ensured safe project delivery.

PROJECT EXECUTION PROCESS

Our experienced construction team followed a structured project execution plan to ensure safe operations, engineering accuracy, and timely completion.

Surveying & Engineering Planning

Topographic surveys, engineering assessments, construction planning, and site mobilization were completed before the start of construction.

01

Earthworks & Excavation

Bulk excavation, rock cutting, grading, embankment construction, compaction, and site preparation were carried out using advanced heavy machinery.

02

Final Inspection & Project Completion

Quality inspections, final grading, project verification, and site restoration were completed before handing the project over to the client.

03

PROJECT CHALLENGES & SOLUTIONS

The project required careful engineering due to mountainous terrain, varying ground conditions, and the need to maintain precise excavation levels throughout construction.

Project Challenges:

Mountainous Terrain:

Construction activities were carried out across uneven ground and rocky formations requiring specialized excavation techniques.

Rock Excavation:

Hard rock conditions required controlled excavation methods and high-capacity equipment to maintain productivity.

Project Coordination:

Efficient coordination between engineering teams, equipment operators, and project management ensured smooth execution throughout the project.

Our Solutions:

Advanced Heavy Equipment Fleet:

Modern excavators, bulldozers, hydraulic breakers, graders, dump trucks, and rollers enabled efficient excavation and earthmoving operations.

Experienced Construction Professionals:

Qualified engineers, surveyors, supervisors, and skilled machine operators monitored every stage of the project to ensure compliance with engineering specifications.

Quality & Safety Management:

Continuous inspections, quality assurance procedures, and strict HSE compliance ensured that all work was completed safely and according to project requirements.