Sharjah Government
Jacobs
Darwish Engineering Emirates
Al Dail Al Handasi Roads Main Cont LLC
3 Million AED
Kerbstones & interlock Tiles
The Maintenance of Roads & Construction of Footpaths & Open Yard Around Khorfakkan Fort project was undertaken to improve the accessibility, safety, and appearance of one of Khorfakkan’s most important public areas. The work included road maintenance, construction of pedestrian footpaths, installation of kerbstones, interlock paving, and development of surrounding open spaces.
77 Contractor completed the project using modern construction techniques and high-quality materials, ensuring every element met the required engineering specifications while preserving the surrounding environment and minimizing disruption to public access.
Repair and improvement of existing road surfaces to enhance driving comfort, durability, and long-term performance.
Construction of safe, accessible pedestrian walkways using durable paving materials designed for long service life.
Precision installation of kerbstones and interlock paving to improve road edges, pedestrian areas, and overall site aesthetics.
Development of surrounding open yard areas to create organized, functional, and visually appealing public spaces.
A carefully managed construction process ensured quality workmanship, timely completion, and minimal disruption to nearby public areas.
Detailed inspections, engineering surveys, and construction planning were completed before work began.
Road repairs, kerbstone installation, footpath paving, interlock works, and open yard development were completed using skilled professionals and modern equipment.
Quality inspections, finishing works, site cleaning, and final approval were completed before the successful handover of the project.
Working within a public and historically significant location required careful planning, quality workmanship, and strict safety procedures throughout construction.
Construction activities were carefully scheduled to minimize disruption to pedestrians and nearby traffic.
High-quality workmanship was essential for kerbstone alignment, interlock paving, and pedestrian pathways.
Multiple construction activities required close coordination to ensure efficient project execution.
Experienced engineers, supervisors, and paving specialists ensured every stage of the project was completed to the highest standards.
Advanced construction equipment and specialized paving tools delivered efficient operations and superior finishing quality.
Regular inspections, material testing, and strict Health, Safety & Environmental (HSE) procedures ensured the project was completed safely and according to client specifications.