Maintenance of Roads & Construction of Footpaths & Open yard Around The Project Khorfakkan Fort

Project Overview

CLIENT:

Sharjah Government

CONSULTANT:

Jacobs

MAIN CONTRACTOR:

Darwish Engineering Emirates

CONTRACTOR:

Al Dail Al Handasi Roads Main Cont LLC

VALUE OF PROJECT:

3 Million AED

SCOPE OF WORK:

Kerbstones & interlock Tiles

The Maintenance of Roads & Construction of Footpaths & Open Yard Around Khorfakkan Fort project was undertaken to improve the accessibility, safety, and appearance of one of Khorfakkan’s most important public areas. The work included road maintenance, construction of pedestrian footpaths, installation of kerbstones, interlock paving, and development of surrounding open spaces.

77 Contractor completed the project using modern construction techniques and high-quality materials, ensuring every element met the required engineering specifications while preserving the surrounding environment and minimizing disruption to public access.

Key features

Repair and improvement of existing road surfaces to enhance driving comfort, durability, and long-term performance.

Footpath Construction

Construction of safe, accessible pedestrian walkways using durable paving materials designed for long service life.

Kerbstone & Interlock Installation

Precision installation of kerbstones and interlock paving to improve road edges, pedestrian areas, and overall site aesthetics.

Public Space Enhancement

Development of surrounding open yard areas to create organized, functional, and visually appealing public spaces.

PROJECT EXECUTION PROCESS

A carefully managed construction process ensured quality workmanship, timely completion, and minimal disruption to nearby public areas.

Site Assessment & Planning

Detailed inspections, engineering surveys, and construction planning were completed before work began.

01

Civil Construction & Finishing

Road repairs, kerbstone installation, footpath paving, interlock works, and open yard development were completed using skilled professionals and modern equipment.

02

Final Inspection & Handover

Quality inspections, finishing works, site cleaning, and final approval were completed before the successful handover of the project.

03

PROJECT CHALLENGES & SOLUTIONS

Working within a public and historically significant location required careful planning, quality workmanship, and strict safety procedures throughout construction.

Project Challenges:

Maintaining Public Access:

Construction activities were carefully scheduled to minimize disruption to pedestrians and nearby traffic.

Precision Finishing:

High-quality workmanship was essential for kerbstone alignment, interlock paving, and pedestrian pathways.

Project Coordination:

Multiple construction activities required close coordination to ensure efficient project execution.

Our Solutions:

Skilled Construction Team:

Experienced engineers, supervisors, and paving specialists ensured every stage of the project was completed to the highest standards.

Modern Equipment & Installation Methods

Advanced construction equipment and specialized paving tools delivered efficient operations and superior finishing quality.

Quality Assurance & Safety:

Regular inspections, material testing, and strict Health, Safety & Environmental (HSE) procedures ensured the project was completed safely and according to client specifications.